Boiler Inspections
In addition the the NYC DEP engineering criteria, the NYC Department of Buildings has updated the compliance for the
BO 9 annual inspections.
2022 Boiler Inspection Cycle - Current : January 1, 2022 to December 31, 2022. Low Pressure Boilers
Internal and External Inspections must be performed and filed with the Department during this cycle
- NYC DOB Annual Inspection & Filing
BO 9 filing & record keeping
BO 13 Affirmation of Correction & filing
OP 49 Self-Certification of Removed, Disconnected,
or Non-Existing Boiler & filing
- NYC DEP Triennial Registration Renewals & Pre Inspections Efficiency Testing
- Opacity Testing & Calibrations
Tuning to meet DEP requirements
Performance Test Worksheet
Application for DEP Inspection
DEP Inspection Assistance